首页> 外文会议>Geoscience and Remote Sensing Symposium, 2005. IGARSS '05. Proceedings. 2005 IEEE International >VIIRS initial performance verification. Subassembly, early integration and ambient phase I testing of EDU
【24h】

VIIRS initial performance verification. Subassembly, early integration and ambient phase I testing of EDU

机译:VIIRS初始性能验证。 EDU的子装配,早期集成和环境第一阶段测试

获取原文

摘要

This paper will examine the initial results of performance verification testing of the first VIIRS sensor, the Engineering Development Unit (EDU). The EDU was completed and began the initial stages of integration testing in late 2004. As the EDU progresses through ambient and thermal vacuum testing, test data are collected, analyzed, and evaluated. Raytheon SBRS evaluates the data for compliance with sensor specifications. Northrop Grumman evaluates the data to ensure the 21 NPOESS System EDRs to which the VIIRS sensor contributes are satisfied. Initial performance estimates that have been derived from sensor models and updated based on subassembly testing are then measured against test data, at each stage of the test plan.
机译:本文将研究第一个VIIRS传感器,即工程开发部门(EDU)的性能验证测试的初步结果。 EDU已完成,并于2004年末开始集成测试的初始阶段。随着EDU进行环境真空和热真空测试,将收集,分析和评估测试数据。雷神SBRS评估数据是否符合传感器规格。诺斯罗普·格鲁曼公司(Northrop Grumman)对数据进行评估,以确保满足VIIRS传感器贡献的21个NPOESS系统EDR。然后,在测试计划的每个阶段,根据测试数据来衡量从传感器模型得出并基于子组件测试进行更新的初始性能估计值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号