Buffalo Pound Water Treatment Plant Lake Intake ExpansionHydraulic Design and Water Quality Considerations

机译:布法罗磅水处理厂湖泊进水膨胀水力设计和水质考量

获取原文

摘要

Buffalo Pound Lake (Lake) is a source of raw water supply for a number of municipal andindustrial users. The Lake, located in south central Saskatchewan is also a regional recreation destination.One of the largest water users on the Lake is the Buffalo Pound Water Treatment Plant (Plant), whichserves the Cities of Regina and Moose Jaw (Cities). The Plant has a capacity of 170 ML/day. Lake wateris conveyed to the Plant via a lake intake, pump station and raw water pipeline. The existing intake andCSP connecting conduit was constructed in the 1950's. Due to concerns for intake reliability and the needfor additional capacity, the Cities proposed to expand the intake capacity in 1999. This paper will presentthe design considerations, challenges and construction aspects associated with the intake expansion.Issues that will be discussed include:? Hydraulic design;? Water quality sampling, monitoring and assessment;? Environmental consideration;? Impact to existing works and construction challenges.As part of this study, an innovative raw water sampling system was developed for continuous monitoringof raw water quality. As the result of the site-specific study, the designer was able to substantially shortenthe lake intake without compromising the raw water quality. The final design included a 6.4 m × 6.4 mintake and a 1650 mm diameter concrete connecting pipe. The change in the intake design resulted in alarge reduction in capital cost and environmental impact. As part of the final design, alternativeconstruction methods were also assessed. The final construction method utilized to construct the intakewas an earth cofferdam and well point dewatering method. A system of floating siltation curtains wasutilized within the lake during the construction period to minimize lake water quality impact. The projectwas successfully completed in 2001/2002 with substantial cost saving to the Owners.
机译:布法罗磅湖(湖)是许多市政和城市供水的原水 工业用户。位于萨斯喀彻温省中南部的湖泊也是该地区的休闲胜地。 湖上最大的用水户之一是布法罗磅水处理厂(工厂), 服务于里贾纳市和穆斯乔市(城市)。该工厂的产能为170毫升/天。湖水 通过湖泊进水口,泵站和原水管道输送到工厂。现有的摄入量和 CSP连接导管始建于1950年代。由于对进气可靠性和需求的关注 为了增加容量,各城市建议在1999年扩大进气量。本文将介绍 与进气口扩展相关的设计考虑因素,挑战和构造方面。 将讨论的问题包括: ?液压设计; ?水质采样,监测和评估; ?环境方面的考虑; ?对现有工程的影响和施工挑战。 作为这项研究的一部分,开发了一种创新的原水采样系统,用于连续监测 原水水质。作为针对特定地点的研究的结果,设计人员能够大幅缩短 在不影响原水水质的情况下进湖。最终设计包括6.4 m×6.4 m 进气口和直径为1650 mm的混凝土连接管。进气口设计的改变导致 大大降低了资本成本和环境影响。作为最终设计的一部分,替代 还评估了施工方法。用于构造进气口的最终构造方法 是一种围堰和井点脱水方法。浮动淤泥窗帘系统是 在施工期间将其用于湖泊中,以最大程度地减少湖泊水质影响。该项目 于2001/2002年成功完成,为业主节省了可观的成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号