首页> 外文会议>Offshore technology conference >The giant serpent Ormen Lange, managing the new key provider of natural gas to Europe from beneath the deep waters of the Norwegian Sea
【24h】

The giant serpent Ormen Lange, managing the new key provider of natural gas to Europe from beneath the deep waters of the Norwegian Sea

机译:巨型蛇伦尔·兰格,从挪威海的深水区管理新的天然气的新关键供应商

获取原文

摘要

Ormen Lange is the name of the second-largest Norwegian gas field and was discovered and identified by Hydro in 1997. The Ormen Lange field comprises four key project features: The offshore subsea solution, approximately 100 km off the northwest coast of Norway, with templates, manifolds and pipelines; the onshore process and gas export facilities at Nyhamna, on the coast of M?re and Romsdal County; the gas export transportation system between Norway and the UK, through a tie-in to the Sleipner field installation as a distribution connector; and the Easington gas reception terminal in the UK. The Ormen Lange field development project is of vital importance, not only to its owners, but also to Norway – making the country the third-biggest exporter of natural gas worldwide. On December 4, 2003, a plan for development and operation (PDO) was submitted to the Norwegian authorities, to embark on the project’s execution phase. The project has been subjected to extraordinary, and in particular technical and commercial challenges which have required the development of and a focus on new management systems and systematic work processes. This paper provides an introduction to the elements that collectively represent the entire Ormen Lange field development, including the key technical and commercial challenges, as well as the management strategy, utilizing systematic work processes to achieve alignment and efficient progress while preserving the environment, personal health and assets.
机译:Ormen Lange是第二大挪威气体领域的名称,并于1997年被Hydro发现和识别。Ormen Lange领域包括四个主要项目特点:离岸海底解决方案,距离挪威西北海岸约有100公里,具有模板,歧管和管道;纽约州的陆上流程和天然气出口设施在M?Re和Romsdal County的海岸;挪威和英国之间的天然气出口运输系统通过搭配到模具现场安装作为分配连接器;和英国的Easington气体接收终端。 Ormen Lange Field Development项目的重要性至关重要,不仅对其业主,而且对挪威来说 - 使该国成为全球第三大的天然气出口国。 2003年12月4日,发展和运营计划(PDO)提交给挪威当局,以踏上项目的执行阶段。该项目已受到非凡,特别是技术和商业挑战,这些挑战需要开发和关注新的管理系统和系统的工作流程。本文介绍了集体代表整个ORMEN Lange现场开发的元素,包括关键的技术和商业挑战,以及管理策略,利用系统的工作流程来实现环境,个人健康的同时实现对准和有效的进展和资产。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号