首页> 外文会议>Offshore technology conference >Methodology for Testing Casing Drilling Connections for High Pressure/High Temperature Applications
【24h】

Methodology for Testing Casing Drilling Connections for High Pressure/High Temperature Applications

机译:用于测试高压/高温应用的套管钻孔连接的方法

获取原文

摘要

The three major requirements for casing drilling connections are for the connection to be fatigue resistant, be able to withstand high torques, and be economical. As casing drilling becomes more common in the industry, the requirements for casing drilling connections will become more critical and will add additional requirements of high pressure/high temperature resistance during and after drilling operations. A methodology for verifying connection performance capabilities will need to be developed to simulate the unique downhole conditions encountered while drilling with casing.
机译:套管钻孔连接的三个主要要求是为了连接耐疲劳,能够承受高扭矩,经济。由于套管钻井在行业中变得更加常见,因此套管钻孔连接的要求将变得更加关键,并且在钻孔操作期间和之后将增加高压/高耐温性的额外要求。需要开发用于验证连接性能功能的方法,以模拟套管钻孔时遇到的独特井下条件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号