COMMISSIONING OF THE PUMP-TURBINE IN TIANHUANGPING PUMPED STORAGE POWER STATION

机译:田黄坪水泵蓄能电站水轮机调试

获取原文

摘要

Tianhuangping pumped storage power station is the largest pumped storage power station in East China Power Grid. The first unit was put into operation in September 1998, and all the six units were put into operation by the end of 2000. This paper describes some problems happened in the commissioning of the pump-turbines. The main problems included no-load unstable operation in low head and joint load rejection of three units in one penstock. Through the commissioning, these problems have been solved, and the units can keep reliable and efficient operation at present. The commissioning and preliminary operation of Tianhuangping pumped storage power station supplies good experience for parameter selection and construction design of pump-turbine. Tianhuangping pumped storage power station plays an important role in East China Power Grid at present for peak and valley operation and emergency standby.
机译:天荒坪抽水蓄能电站是华东电网最大的抽水蓄能电站。第一台机组于1998年9月投入运行,六台机组全部于2000年底投入运行。本文介绍了水泵水轮机调试中出现的一些问题。主要问题包括低扬程下的空载不稳定运行,以及一支压力管中的三个单元的联合载荷抑制。通过调试,解决了这些问题,并且这些单元目前可以保持可靠,高效的运行。天荒坪抽水蓄能电站的调试和初步运行为抽水汽轮机的参数选择和施工设计提供了良好的经验。天峰坪抽水蓄能电站目前在华东电网中对峰谷运行和应急备用起着重要作用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号