THREE GORGES PROJECT: THE TURBINES OF LEFT BANK POWERSTATION

机译:三峡项目:左岸电站的涡轮

获取原文

摘要

Alstom is involved in the design, manufacturing, erection and commissioning of 8 turbines and generators of the Three-Gorges left bank PowerStation and supply the governing systems for all the left bank 14 units. This paper details the main design choices made by Alstom for the turbines and explains the challenges in organizing the worldwide manufacture and the installation of these so big units. Many Chinese industry staffs have also been trained all along the different phases of realization. Finally the successful commissioning of 3 units in October 2003 within only 4 months validates the performance of Alstom in engineering and management of this large project.
机译:Alstom参与了8个涡轮机的设计,制造,勃起和调试的三峡左岸Powerstation的8个涡轮机和发电机,并为所有左岸14个单位提供管理系统。本文详细介绍了阿尔斯通对涡轮机制造的主要设计选择,并解释了组织全球制造和安装这些如此大单位的挑战。许多中国工业员工也沿着实现的不同阶段培训。最后,2003年10月的3个单位成功调试只有4个月验证了Alstom在这一大型项目的工程和管理方面的表现。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号