首页> 外文会议>International Conference on Hydropower >RESEARCH ON THE CONSTRUCTION OF THE CUT OFF WALL IN THE FOUNDATION OF PUBUGOU DAM
【24h】

RESEARCH ON THE CONSTRUCTION OF THE CUT OFF WALL IN THE FOUNDATION OF PUBUGOU DAM

机译:蒲布沟大坝基础防渗墙施工研究。

获取原文

摘要

The two concrete cut off walls of the dam base in Pubugou power station are 1.2m wide and with depth over 80m. The construction of impervious wall is difficult to construct because of the geology and the construction period, the construction progress and quality are key to determine whether the station can generate electricity on time and whether the reservoir can operate safely. Taken the construction of impervious wall in several like projects in home for examples, through comparing and analyzing, the construction method and suggestion are put forward in this article.
机译:瀑布沟电站坝基的两块混凝土防渗墙宽1.2m,深度超过80m。由于地质和施工周期的原因,防渗墙的施工比较困难,施工进度和质量是决定电站能否按时发电以及水库能否安全运行的关键。以国内多个类似工程的防渗墙施工为例,通过比较分析,提出了施工方法和建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号