Systems assurance for the integrated control and communications system for KCRC east rail extensions

机译:九广铁路东铁支线综合控制及通讯系统的系统保证

获取原文

摘要

The Kowloon Canton Railway Corporation (KCRC) in Hong Kong has embarked upon extensions to the East Rail Line that include:- (i) extensions south to East Tsim Sha Tsui station; (ii) a new Rail Line out to Ma On Shan; and, (iii) the development of a spur line in the northwest to Lok Ma Chau. As part of these extensions the existing Integrated Control and Communications System (ICCS), in use on the East Rail, is to be upgraded and extended to cover the new extended railway. The upgrades include provision of additional hardware, new communications infrastructure, additional system configuration and some new software functionality. The original ICCS was commissioned in 1998. It was engineered to SIL 2 pursuant to draft British Standard RIA 23, with additional requirements per the systems assurance regime in force at KCRC during the period 1993-1998. Since that time, standards have matured and KCRC's own internal systems assurance processes have also evolved. The ICCS upgrade is required to be compliant to Cenelec Standard EN 50128, and also to a new set of internal systems assurance requirements. The challenge on this project is to maximise re-use of existing systems assurance collateral while still ensuring functional coverage of the new system, and compliance to the new requirements. This paper describes the ICCS upgrade project and the systems assurance program employed on that project. The regulatory framework is described, as are some of the internal systems assurance requirements imposed by KCRC. At time of presentation, the project has just completed Final Design Review and the first stage of the Operational Safety Report is in preparation.
机译:香港九龙广交院(KCRC)在香港延伸到东铁路线的扩展包括: - (i)南尖沙咀站南部的延伸; (ii)山上的新铁路线; (iii)在西北地区的刺线到洛克马洲的发展。作为这些扩展的一部分,现有的集成控制和通信系统(ICCS),在东轨上使用,升级并扩展以覆盖新的扩展铁路。升级包括提供额外的硬件,新的通信基础架构,额外的系统配置和一些新的软件功能。原始ICCS于1998年委托。根据英国标准RIA 23草案,它被编程为SIL 2,在1993 - 1998年期间,根据KCRC的系统保证政权的额外要求。从那时起,标准已经成熟,KCRC自己的内部系统保证过程也在演变。 ICCS升级必须符合CENELEC标准EN 50128,以及新的内部系统保证要求。对该项目的挑战是最大限度地利用现有系统保证抵押品,同时仍然确保新系统的功能覆盖,并遵守新要求。本文介绍了ICCS升级项目和该项目采用的系统保证计划。描述了监管框架,也是KCRC施加的一些内部系统保证要求。在介绍时,该项目刚刚完成了最终的设计审查,运营安全报告的第一阶段正在准备。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号