首页> 外文会议>SPE/EPA/DOE exploration and production environmental conference >Production of Pipeline Quality Natural Gas with the Molecular Gate~R? CO_2 Removal Process
【24h】

Production of Pipeline Quality Natural Gas with the Molecular Gate~R? CO_2 Removal Process

机译:用Molecular Gate〜R?生产管道质量的天然气CO_2去除工艺

获取原文

摘要

In May of 2002, the first Molecular Gate~R–Carbon DioxideRemoval system for the removal of carbon dioxide and waterwas started-up at the Tidelands Oil Production Companyoperated facility in Long Beach, California. The feed sourcefor the unit is hydrocarbon rich, water-saturated, associatedgas from water flood enhanced oil recovery operations. Thefeed CO_2 concentration varies widely and is typically over30% while the unit reduces the carbon dioxide level to lessthan 2%. The unit removes the carbon dioxide, heavyhydrocarbons and water producing pipeline specification gasfor sale to the local natural gas utility company.
机译:在2002年5月,第一个分子门〜R –二氧化碳 去除二氧化碳和水的去除系统 在Tidelands石油生产公司启动 在加利福尼亚州长滩经营的工厂。提要来源 因为该单元富含烃,水饱和,伴有 水驱产生的天然气提高了石油采收率。这 饲料中的CO_2浓度变化很大,通常超过 30%,而装置将二氧化碳水平降低到更少 超过2%。该装置去除了重的二氧化碳 碳氢化合物和水生产管道规范气体 出售给当地的天然气公用事业公司。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号