首页> 外文会议>Watershed Management >Sustainable Management Of Archaeologically Important Monuments: A Case Study Of Indira Sagar Project (1000 MW) And Omkareshwar Project (520 MW) M.P., India
【24h】

Sustainable Management Of Archaeologically Important Monuments: A Case Study Of Indira Sagar Project (1000 MW) And Omkareshwar Project (520 MW) M.P., India

机译:考古重要古迹的可持续管理:印度M.P.的Indira Sagar项目(1000 MW)和Omkareshwar项目(520 MW)的案例研究

获取原文

摘要

Indira Sagar Project and Omkareshwar Project are ambitious multipurpose project on Narmada River. The projects would generate 1000 MW and 520 MW respectively of hydel power to meet the ever-increasing demands for electricity in Madhya Pradesh. The irrigation potential would be of the order of 1.69 lac ha and 1.47 lac ha annually. The biggest ever man made lake will be created (913 sq.km) to hold about 12 billion cubic metre of water storage in the reservoir of Indira Sagar Project. As a result of these reservoir creation, 91348 ha and 9336 ha of land would be submerged affecting 249 and 30 villages in Indira Sagar and Omkareshwar project respectively. Narmada River is the west flowing river having its origin in Amarkantak in M.P (Annex-I). All old civilisations flourished near the banks of perennial rivers of which remains are found. The Narmada valley is no exception and as such the valley is very rich in archaeologically important wealth. The Archaeological Monuments are thus required to be saved from permanent submergence as also the important mounds are to be excavated for further collection of knowledge about historic value buried under earth before the large tracts of such location gets submerged. An ambitious programme of salvaging the heritage getting affected due to construction of Indira Sagar Project and Omkareshwar Project is currently underway. The Power component (Dam & Power Houses) of the Projects is being constructed by NHDC Ltd. (A Joint Venture of NHPC & Govt. of Madhya Pradesh). In the present paper an attempt has been made to highlight the various efforts being made to translocate/restore/retrieve the archaeological wealth available scattered in the submergence area of the projects scientifically. The construction programme is scheduled in such a way that no monument comes under submergence before it is properly translocated/restored.
机译:英迪拉萨加尔(Indira Sagar)项目和Omkareshwar项目是纳尔默达河(Narmada River)上雄心勃勃的多功能项目。这些项目将分别产生1000兆瓦和520兆瓦的海德尔电力,以满足中央邦不断增长的电力需求。每年的灌溉潜力约为1.69 lac ha和1.47 lac ha。将建造有史以来最大的人造湖(913平方公里),以容纳Indira Sagar项目水库中约120亿立方米的水。这些水库建设的结果是,将淹没91348公顷和9336公顷的土地,分别影响Indira Sagar和Omkareshwar项目的249个和30个村庄。纳尔默达河(Narmada River)是一条向西流动的河流,起源于M.P(附件I)的阿马尔坎塔克(Amarkantak)。所有古老的文明在常年盛行的河岸附近繁荣昌盛,但仍被发现。纳尔默达山谷也不例外,因此该山谷具有考古学上的重要财富。因此,需要将考古古迹从永久性的淹没中解救出来,同时还要挖掘重要的土丘,以便在大片土地被淹没之前,进一步收集有关埋在地下的历史价值的知识。目前正在实施一项雄心勃勃的计划,以保护因Indira Sagar项目和Omkareshwar项目的建设而受到影响的遗产。 NHDC Ltd.(NHPC和中央邦政府的合资企业)正在建设项目的电力组件(坝和发电站)。在本文中,已经进行了一些尝试来突出显示为科学地转移/恢复/取回分散在项目淹没区域中的可用考古财富而进行的各种努力。施工计划按计划进行,以确保没有任何纪念碑被淹没,然后对其进行适当的转移/恢复。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号