Some Experience in the Execution, QA and QC of Deep Foundations in Weak Rock in Slovenia

机译:斯洛文尼亚弱岩深层基础的执行,质量保证和质量控制的一些经验

获取原文

摘要

The paper deals with some geotechnical problems which were encountered in the construction of deep foundations for structures that have been under construction over the fast two years along the demanding, 16.8 km long Vransko-Blagovica section of the southeast-northwest motorway link, which is part of the Slovenian National Motorway Construction Programme. Along this section the motorway runs across morphologically very varied hilly ground, so that 13 viaducts, 18 bridges, and 5 tunnels, as well as many retaining and supporting structures up to 12 m high, are needed. The bedrock consists mainly of weak, tectonically altered Carboniferous - Permian rocks, which are predominantly clayey schists, siltstones and sandstones. To assist in the design of this motorway section and its structures, over 13,000 metres of trial boreholes, as well as various field and laboratory tests, were executed. A general geological description of the area is presented, together with some of the strength and deformation characteristics of the typical rock types. An example of the deep, piled and caissoned foundations which were needed for the construction of a viaduct is presented, including the assembly of geotechnical data and the execution of the works. Some geotechnical problems, which were encountered during the construction of an anchored piled wall are also presented, with emphasis on the results of geotechnical monitoring obtained during and after construction. Conformity between predicted and actual in-situ geotechnical conditions was verified by means of quality assurance/quality control procedures, according to the programme specified in the National Motorway Construction Programme.
机译:本文涉及一些岩土问题,这些问题在沿着苛刻的两年内进行建设的建设中遇到的岩土问题,这是东南 - 西北高速公路环节的16.8公里的vransko-blagovica段,这是一部分斯洛文尼亚国家高速公路建设方案。沿着这一部分,高速公路在形态上运行非常多样化的丘陵地面,使得需要13个高架桥,18个桥和5个隧道,以及多达12米高的挡泥板,以及高达12米高的隧道。基石主要由弱势,根本改变的石炭纪 - 二叠纪岩石组成,这主要是克莱尼分类,淤泥和砂岩。为了帮助设计这种高速公路部分及其结构,执行了超过13,000米的试验孔,以及各种场和实验室测试。呈现了该区域的一般地质描述,以及典型岩石类型的一些强度和变形特性。提出了一个建造高架桥所需的深,堆和沉积的基础的一个例子,包括岩土数据的组装和作品的执行。还提出了一些岩土问题,在锚定堆墙上遇到的岩土问题,重点是在建设期间和之后获得的岩土监测结果。根据国家高速公路施工计划规定的计划,通过质量保证/质量控制程序验证了预测和实际原位地理工程条件之间的符合性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号