【24h】

INTERSTAGE INJECTION into AXIAL COMPRESSOR, GAS TURBINE MODEL 7EA, PART 2

机译:中间注入轴向压缩机,燃气轮机模型7EA,第2部分

获取原文

摘要

This paper describes the efforts of upgrading the original Interstage Injection System (IIS) that was installed in Gas Turbine Unit (GTU) No2, Summer 2000. Paper presented by Ingistov, No 2001-GT- 407 at IGTI Conference in New Orleans, June 2001 describes the original IIS design and its operational results. As presented in New Orleans IGTI Conference the main purpose of Interstage Injection (Ⅱ) is to preserve the Gas Turbine Unit (GTU) power output rather than augment the power output. Some power augmentation however takes place, and with gradual increase of the injected water flow the power gain will have to be quantified. This paper incorporates design changes of the water injection nozzles and the field results on GTU No1 compiled during Summer and Fall of 2001 in Watson Cogeneration Company (WCC) Plant in Carson California.
机译:本文介绍了对2000年夏季安装在2号燃气轮机(GTU)中的原始级间喷射系统(IIS)进行升级的努力。Ingistov在2001年6月于新奥尔良举行的IGTI会议上发表的论文,编号2001-GT- 407。描述了原始的IIS设计及其操作结果。如在新奥尔良IGTI会议上介绍的,级间喷射(Ⅱ)的主要目的是保持燃气轮机单元(GTU)的功率输出,而不是增加功率输出。但是,会发生一些功率增加,并且随着注入水流量的逐渐增加,必须对功率增益进行量化。本文结合了注水嘴的设计变更以及在2001年夏季和秋季在美国加利福尼亚州卡森市的Watson Cogeneration Company(WCC)工厂中汇编的GTU No1的现场结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号