Preventive maintenance is essential for every chemical production site, as it can prevent equipment failure and accidents. In order to minimize the production loss caused by maintenance, the maintenance has to be carefully scheduled. To obtain an optimal maintenance strategy for a whole production site, the maintenance schedules of the production and utility plant have to be tackled simultaneously considering site-wide utility and material balances. However, the interconnections between production and utility system make the scheduling problem become very complex and difficult. In this paper, a multi-period mixed integer linear programming model, Site Model, is proposed as an aid to optimize short-term site-wide maintenance schedule. A special formulation is adopted to handle pre-set utility and material demand profiles during the shutdown, maintenance and start-up periods of plants.
机译:预防性维护对于每个化学生产现场至关重要,因为它可以防止设备故障和事故。为了最大限度地减少维护造成的生产损失,必须仔细安排维护。为了获得整个生产现场的最佳维护策略,必须同时考虑现场效用和物质余额的同时解决生产和型电厂的维护时间表。然而,生产和实用系统之间的互连使调度问题变得非常复杂和困难。本文提出了一种多时期混合整数线性编程模型,站点模型,以优化短期站点范围维护计划的辅助工具。采用特殊配方在关闭,维护和启动植物期间处理预先设定的实用和材料需求配置文件。

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号