【24h】

DC Furnace Improvements at SMI Steel-Alabama

机译:SMI阿拉巴马州直流炉的改进

获取原文

摘要

SMI, responding to the needs of the marketplace and in anticipation of future demand, undertook these projects with the aim of becoming a 600,000 ton / year melt shop. Further, we did this with the goal of reducing conversion costs, increasing quality and safety and increasing shop reliability. We feel that these goals have been met, and with continued refinement of shop practices, will be exceeded in the years to come.
机译:SMI为响应市场需求并满足未来需求,进行了这些项目,旨在成为一个年产60万吨/年的熔炼车间。此外,我们这样做的目的是降低转换成本,提高质量和安全性并提高车间可靠性。我们认为已经实现了这些目标,并且随着店铺实践的不断完善,未来几年将超越这些目标。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号