首页> 外文会议>Sixth Biennial IEEE-USA Careers Conference, 1989., 1989 >Induction synchrotron. III. Rapid cycle synchrotron and slow cyclesynchrotron. (Hardware components for the upgrade of KEK 12 GeV PS)
【24h】

Induction synchrotron. III. Rapid cycle synchrotron and slow cyclesynchrotron. (Hardware components for the upgrade of KEK 12 GeV PS)

机译:感应同步加速器。三,快速循环同步加速器和慢速循环同步加速器。 (用于升级KEK 12 GeV PS的硬件组件)

获取原文

摘要

A technique of super-bunch acceleration with high repetitioninduction accelerators and an accumulator ring (AR) are required for theupgrade of the 12 GeV proton synchrotron at KEK. A fast dynamicswitching of 3 kV flip-flop pulses was performed at 200 kHz withSI-thyristors, to confirm a barrier bucket scheme for inductionacceleration. On the other hand, a model permanent gradient magnet forthe AR was assembled to investigate its field quality, temperaturedependence and compensation
机译:高重复率的超束加速技术 感应器需要一个加速器和一个储能环(AR)。 KEK的12 GeV质子同步加速器的升级。快速动态 3 kV触发器脉冲的切换是在200 kHz下进行的 SI晶闸管,以确认用于感应的隔离桶方案 加速。另一方面,模型永久梯度磁铁用于 组装了AR以调查其现场质量,温度 依赖与补偿

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号