首页> 外文会议>Technology Requirements for Biomedical Imaging, 1991. Proceedings >Observed changes in residential and commercial customerinterruption costs in the Pacific Northwest between 1989 and 1999
【24h】

Observed changes in residential and commercial customerinterruption costs in the Pacific Northwest between 1989 and 1999

机译:观察到住宅和商业客户的变化1989年至1999年期间西北太平洋的中断成本

获取原文

摘要

In 1989, the Electric Power Research Institute and BonnevillePower Administration conducted pioneering surveys of the interruptioncosts experienced by residential and commercial and industrial customersin the Pacific Northwest. In early 1999, Puget Sound Energy (PSE)surveyed its customers using statistical sampling techniques and outagecost measurement procedures nearly identical to those used in theBPA/EPRI study. This paper compares the results obtained from those twooutage cost surveys focusing on the differences in costs that wasobserved between them. The results of the comparison indicate thatcustomer interruption costs have increased dramatically for residentialcustomers. Comparison of interruption costs for commercial andindustrial customers does not support the conclusion that interruptioncosts for these customers increased over the period. The paper concludeswith a discussion of the implications of these findings for utilityplanning and regulation
机译:1989年,电力研究所和邦纳维尔 电力管理局对中断进行了开创性调查 住宅,商业和工业客户的成本 在太平洋西北地区。 1999年初,普吉特海湾能源(PSE) 使用统计抽样技术和中断对客户进行了调查 成本计量程序几乎与 BPA / EPRI研究。本文比较了从这两个获得的结果 停机成本调查着重于成本差异 在他们之间观察。比较结果表明 住宅客户中断成本急剧增加 顾客。商业广告和电视广告中断费用的比较 工业客户不支持中断的结论 这些客户的成本在此期间有所增加。本文结论 讨论了这些发现对效用的影响 规划与监管

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号