【24h】

Hypertool/2: A Parallel Incremental DAG Scheduling System

机译:Hypertool / 2:并行增量DAG调度系统

获取原文

摘要

Hypertool/2 is a dynamic parallel incremental DAG scheduling system extended from our previous static scheduling system, Hypertool. A DAG is expanded incrementally, scheduled, and executed on a parallel machine. A DAG scheduling algorithm is parallelized for large systems. In this approach, a large DAG can be executed without consuming a large amount of memory space. Inaccurate estimation of task execution time and communication time can be tolerated. This runtime approach also can execute dynamic DAGs. Implementation of this parallel incremental system demonstrates the feasibility of this approach.
机译:Hypertool / 2是一个动态并行增量DAG调度系统,它是从我们先前的静态调度系统Hypertool扩展而来的。 DAG在并行计算机上进行增量扩展,计划和执行。 DAG调度算法已针对大型系统并行化。通过这种方法,可以执行大的DAG,而不会占用大量的存储空间。可以容忍对任务执行时间和通信时间的不正确估计。这种运行时方法也可以执行动态DAG。此并行增量系统的实现证明了此方法的可行性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号