首页> 外文会议>International joint power generation conference >A review of the evolution and modifications made to extend component life for a ge stag-100 combined cycle unit
【24h】

A review of the evolution and modifications made to extend component life for a ge stag-100 combined cycle unit

机译:回顾为延长ge stag-100联合循环装置的使用寿命而进行的改进和改进

获取原文

摘要

This is a review of the development of modifications made to combustion turbine component hardware to extend the service life of the components and the time between outages for a single shaft combiend cycle unit (GE STAG 100 -7E GT). The original time between outages was less than 500 hours; toady that same interval has exceeded 10,000 hours by utilizing revised clearances, updated materials and wear resistant coatings and thermal barrier coatings.
机译:本文回顾了对燃气轮机组件硬件所做的改进开发,以延长组件的使用寿命以及单轴组合循环单元(GE STAG 100 -7E GT)停机之间的时间。两次中断之间的原始时间少于500小时;通过使用经过修订的间隙,更新的材料以及耐磨涂层和热障涂层,相同的时间间隔已超过10,000小时。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号