首页> 外文会议>International water resources engineering conference >Sediment budget for the upper mississippi river
【24h】

Sediment budget for the upper mississippi river

机译:密西西比河上游的泥沙预算

获取原文

摘要

A system of locks dams to improve navigation was constructed along the Upper Missippi River (UMR) about 60 years ago. The system has influenced the physical and ecological characteristics of the river in many ways. One of the most significant influences of the system has been its effect on sediment transport along the river. Altered sediment trapsort conditions are evident both as system-wide and localized impacts. A sediment budget encompassing about 670 km of the UMR was developd to quantify the sediment transport conditions within the lock and dam system (Pools 11 to 26). The magnitude to major sources and sinks of sediment within the s ystem were quantified. By comining the results of the sediment budget with data derived from the analysis of historic river plan form information, an estimate of sedimentation rates within the backwater ares of the navigation pools was obtained.
机译:大约60年前,沿着密西西比河上游(UMR)修建了一个防洪堤坝系统,以改善航行状况。该系统从许多方面影响了河流的物理和生态特征。该系统最重要的影响之一是其对沿河泥沙输送的影响。沉积物陷阱分类条件的改变在整个系统范围和局部范围的影响中都是明显的。制定了涵盖UMR约670公里的沉积物预算,以量化闸坝系统(池11至26)中的沉积物运输条件。对系统内主要沉积物源和汇的量进行了定量。通过将沉积物预算的结果与对历史河流计划形式信息的分析得出的数据相结合,可以估算出导航池回水区内的沉积率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号