首页> 外文会议>International water resources engineering conference >ROotwad bank stabilization on the middel rio grande
【24h】

ROotwad bank stabilization on the middel rio grande

机译:大里约热内卢的根银行稳定

获取原文

摘要

The Albuquerque Area Office of he Bureau of Reclamation (Reclamation) installed a test section of rootwads with boulders on the Middle Rio Grande to provide bank protection at a bend located in the Santa Clara Indian Puebol, approximately 121 km (75 miles) upstream of Albuquerque, New Mexico. During the first season of operation, a discharge of 201 m~3/s (7,110 ft~3/s) was experimenced at the iste. Some of the bankline between the rootwads experimenced erosion.
机译:他的填海局(填海区)的阿尔伯克基地区办事处(填海局)安装了rootwads的测试部门,其中Rio Grande中间的巨石是在阿尔伯克克的Santa Clara Indian Puebol的弯道上提供银行保护,在阿尔伯克克(Albuquerque)上游约121公里(75英里) , 新墨西哥。在第一季的操作期间,在ISTE上验证了201米〜3 / s(7,110英尺〜3 / s的放电。 rootwads经验性侵蚀之间的一些银行线。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号