首页> 外文会议>SPE/ISRM symposium on rock mechanics in petroleum engineering >Sand production on water injectors: just how bad can it get?
【24h】

Sand production on water injectors: just how bad can it get?

机译:水注射器上的沙子生产:它可以得到多么糟糕?

获取原文

摘要

This paper presents a field case based upon a reservoir operated by Statoil in the Norwegian Sea. The case concerns a series of water injectors - i.e. both sub-sea and platform - that underwent extreme losses of injectivity over short periods of time. When worked over, the wells showed extreme amounts of sand fill that sometimes were several hundreds of meters above the top perforation. Furthermore, the link between well shut-ins and injectivity losses was clear right from the onset of the study.
机译:本文介绍了一个基于挪威海运单体运营的水库的现场案例。这种情况涉及一系列水喷射器 - 即次海和平台 - 在短时间内接受了极端的注射损失。在工作时,井显示出极端的砂填充,有时在顶部穿孔上方几百米。此外,从研究的开始,良好的关闭与注射损失之间的链接是明确的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号