【24h】

Independent validation of specifications: a coordination headache

机译:独立验证规格:协调问题

获取原文

摘要

Large, complex projects face significant barriers to coordination and communication due to continuous, rapid changes during a project's lifecycle. Such changes must be tracked, analyzed, and reconciled to ensure high quality in the end product, otherwise problems may be get lost or ignored in the overall complexity. We report on "work in progress" in the study of coordination problems between two independent separate groups: software development and software analysis. We have begun to construct a taxonomy of coordination problem, which we illustrate with two scenarios. We briefly describe current attempts to introduce incremental improvements to coordination problems in such projects via World Wide Web tools. Based on actual project experiences, we plan to deploy such tools in a non intrusive fashion to improve coordination and communication between software development groups.
机译:大型,复杂的项目由于在项目生命周期中不断发生快速变化,因此在协调和沟通方面面临很大的障碍。必须跟踪,分析和协调这些更改,以确保最终产品的高质量,否则,可能会丢失或忽略整体复杂性中的问题。我们在研究两个独立的独立小组之间的协调问题时报告“正在进行的工作”:软件开发和软件分析。我们已经开始构建协调问题的分类法,并通过两种情况进行说明。我们简要介绍了当前尝试通过万维网工具逐步改进此类项目中的协调问题的尝试。根据实际的项目经验,我们计划以非侵入性的方式部署此类工具,以改善软件开发团队之间的协调和沟通。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号