首页> 外文会议>Nondestructive Evaluation of Aging Structures and Dams >Crosshole seismic methods to assess the seismic stability of earthen dams
【24h】

Crosshole seismic methods to assess the seismic stability of earthen dams

机译:评估土坝地震稳定性的井间地震方法

获取原文

摘要

Abstract: An in situ geophysical investigation consisting of crosshole and downhole shear wave (S-wave) and surface vibratory tests was performed at Sardis Dam, located on the Tallahatchie River in northwest Mississippi. Tests were conducted in a pile test section at the downstream toe of the dam. The purpose of the investigation was to determine changes in S-wave velocities, which are related to soil strength, in the test section due to pile driving activities. Comparison tests were conducted three times: prior to driving the piles, immediately after, and three months after the piles had been driven. The S-wave crosshole and surface vibratory tests indicated a significant velocity increase, averaging more than 20 percent, due to the driving of piles in the test section. Of the geophysical tests conducted, crosshole testing was the most sensitive in denoting velocity changes. The downhole S-wave test did not detect any significant velocity increases. The scope of this paper is limited to results of crosshole testing. !9
机译:摘要:在密西西比州西北部塔拉哈奇河上的萨迪斯大坝进行了由井间和井下剪切波(S波)和地表振动试验组成的原位地球物理研究。测试是在大坝下游脚趾的桩测试部分进行的。研究的目的是确定由于打桩活动而导致的试验段中与土壤强度有关的S波速度变化。进行了三次比较测试:在打桩之前,刚打桩之后以及打桩之后三个月。 S波横孔和表面振动测试表明,由于在测试区域中打桩,速度显着提高,平均提高了20%以上。在进行的地球物理测试中,横孔测试在表示速度变化方面最敏感。井下S波测试未发现任何明显的速度增加。本文的范围仅限于交叉孔测试的结果。 !9

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号