摘要

Older power stations are now double shifting and life is being extended. It is now necessary as part of the refurbishment programme to replace the switchgear. The author discusses the design of new vacuum switchgear to meet the needs of refurbishment. Various aspects of the design are discussed including the thermal rating, busbars, construction, earthing switch, materials, and testing. The Aberthaw power station refurbishment project is described as an example.
机译:现在,较老的发电站正在两次换班,并且寿命正在延长。作为翻新计划的一部分,现在有必要更换开关柜。作者讨论了满足翻新需求的新型真空开关柜的设计。讨论了设计的各个方面,包括热额定值,母线,结构,接地开关,材料和测试。以阿伯索(Aberthaw)电站翻新项目为例。