首页> 外文会议>Refurbishment of Power Station Electrical Plant, 1988. International Conference on >Liddell Power Station plant improvement study: the refurbishment of AC and DC auxiliary systems switchgear
【24h】

Liddell Power Station plant improvement study: the refurbishment of AC and DC auxiliary systems switchgear

机译:利德尔发电站工厂改进研究:交流和直流辅助系统开关设备的整修

获取原文

摘要

Liddell Power Station is a base-load coal-fired installation of 2000 MW capacity comprising 4*500 MW sets situated in the NSW Hunter Valley, Australia. The age of Liddell, its significant capacity, and its favourable location for fuel sourcing dictated it as a natural choice for a comprehensive life-extension study. The author discusses the AC and DC auxiliary systems switchgear refurbishment. The AC switchgear was of 11 kV, 3.3 kV, and 415 V. The DC switchgear was of 50 V and 110 V. A cost/benefit analysis is given of the refurbishment.
机译:Liddell电站是位于澳大利亚新南威尔士州猎人谷的2000 MW容量的基本负荷燃煤装置,包括4 * 500 MW机组。利德尔(Liddell)的年龄,其强大的能力以及优越的燃料采购条件使它成为进行综合寿命延长研究的自然选择。作者讨论了交流和直流辅助系统开关柜的整修。交流开关设备的电压分别为11 kV,3.3 kV和415V。直流开关设备的电压分别为50 V和110V。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号