Assuring the integrity of large electrical machines in a power station refurbishment programme

机译:在电站翻新计划中确保大型电机的完整性

获取原文
获取外文期刊封面目录资料

摘要

A considerable number of the 500 MW unit fossil-fired power stations, built by the generating boards in the UK in the late 1960s and early 1970s, are at or approaching their design life of 20 years. There are powerful economic arguments for extending the life of these stations to 30 or 40 years, providing the cost of refurbishment to achieve this aim is not excessive. These arguments are being sharpened by the impending privatisation of the electricity supply industry, following which it is expected that a higher return on the capital invested in installed plant will be required. The authors discuss technical arguments for the refurbishment of large electrical machines in power stations. They highlight for operations and maintenance engineers, the criteria which should be applied in a refurbishment programme to decide whether an electrical machine needs to be left alone, refurbished or even replaced.
机译:由英国发电局在1960年代末和1970年代初建造的大量500 MW单元化石火力发电厂的设计寿命已经或接近20年。有经济上有力的理由将这些电站的寿命延长至30或40年,前提是为达到该目的而进行翻新的费用不算过高。即将到来的供电行业私有化使这些论点变得更加尖锐,此后预计将需要更高的投资于已安装工厂的资本回报率。作者讨论了翻新发电站中大型电机的技术论点。它们为操作和维护工程师强调了在翻新计划中应采用的标准,以决定是否需要单独放置,翻新或更换电机。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号