Back-fill grout with two component mix in EPB tunneling to minimize surface settlements: Rome Metro-Line C case history

机译:在EPB隧道中采用两种成分混合的回填浆,以最大程度地减少表面沉降:Rome Metro-Line C的案例

获取原文

摘要

The instantaneous filling of the annulus created behind the segment lining at the endof the tail shield during TBM advance is an operation of paramount importance. Its main goal is tominimize displacements around the tunnel and induced surface settlements due to lost volume at the tailshield. For correctly achieving these goals, the simultaneous back-filling system and the injected materialshould satisfy technical, operational and performance characteristics. The two-component injectionsystem for back-filling while excavating with shielded TBMs is progressively replacing the traditional useof cementitious mortars.In the paper different systems of back-filling grout and in particular the two-component system areanalyzed and discussed together with a description of the Rome Metro (Line C) case history where thistype of back-filling was widely applied.
机译:最终填充段衬里后产生的环空的瞬时填充 在TBM推进过程中对尾罩进行防护是至关重要的操作。其主要目标是 最小化隧道周围的位移以及由于尾部体积损失而引起的地面沉降 盾。为了正确实现这些目标,需要同时进行回填系统和注入的物料 应满足技术,运营和性能特征。二组分注射 盾构TBM开挖时回填的系统正在逐步取代传统用途 水泥砂浆。 在本文中,不同的回灌浆系统,特别是两组分系统是 与罗马地铁(C线)案例历史的描述一起进行分析和讨论,其中 回填类型广泛应用。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号