首页> 外文会议>International Conference on Algorithmic Applications in Management >Revisit of the Scheduling Problems with Integrated Production and Delivery on Parallel Batching Machines
【24h】

Revisit of the Scheduling Problems with Integrated Production and Delivery on Parallel Batching Machines

机译:重温并行配料机上集成生产和交付的计划问题

获取原文

摘要

In the paper, we revisit the scheduling problems with integrated production and delivery on parallel batching machines. There are n jobs and m identical and parallel batching machines. The machines have identical capacities and the jobs have identical processing time. When a job is processed and delivered to customers in time, the company earns profit; otherwise, it earns nothing. A third party logistic (3PL) provider will be used to deliver the jobs. It provides certain vehicles with identical capacities at some certain time points. In the paper [Kai Li, Zhao-hong Jia, Joseph Y.-T. Leung (2015) Integrated production and delivery on parallel batching machines, European Journal of Operational Research, 247(3), 755-763.], the authors considered the scheduling problems and designed the algorithms to deal with them. But unfortunately, there are some wrong conclusions. Specifically, we construct counterexamples to show that both of Theorem 4 and Theorem 5 are invalid. Furthermore, we provide two faster algorithms than Algorithm Sch-Id-Size.
机译:在本文中,我们重新审视了在并行配料机上集成生产和交付的调度问题。有n个工作,m个相同和并行的配料机。机器具有相同的容量,并且作业具有相同的处理时间。当一项工作得到及时处理并交付给客户时,公司就可以赚钱;否则,它一文不值。第三方物流(3PL)提供商将用于交付工作。它在某些时间点为某些车辆提供相同的容量。在论文中[Kai Li,Jia Zhao-hong Jia,Joseph Y.-T. Leung(2015)并行配料机上的集成生产和交付,欧洲运筹学杂志,247(3),755-763。],作者考虑了调度问题并设计了处理这些问题的算法。但是不幸的是,有一些错误的结论。具体来说,我们构造了一些反例以表明定理4和定理5都是无效的。此外,我们提供了两种比算法Sch-Id-Size更快的算法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号