Holistic Water Use Assessment for Automotive Manufacturing in a Water-Stressed Region

机译:缺水地区汽车制造业整体用水评估

获取原文

摘要

Based on the evaluations of the Saltillo Complex's water concession title, well and aquifer capacities, and availability of supplemental water rights from third parties, a number of potential issues exist with attempting to increase the water supply to the facility. While the current extraction wells likely have the capacity to provide increased flow, the aquifer itself may be limiting, and water quality is of potential concern. In addition, CONAGUA is limiting withdrawals from the aquifer, which could complicate an attempt to increase current concession volumes. The acquisition of additional water rights from third parties also presents potential legal and financial challenges. Therefore, the preferred approach to securing sufficient water supply to meet future production demand is to increase the efficiency of current water usage at the complex. The WKB audit of the most water-intensive areas of the complex yielded an array of potential water conservation and reuse opportunities. Arcadis has provided a recommended approach to project implementation based on relative complexity, cost, and return on investment which is estimated to provide approximately 30% reduction of water use at the complex. This reduction would provide ample capacity within the existing water concession available to the complex to support the imminent increase in production at the complex and eliminates the need to identify and secure an additional water supply.
机译:根据对萨尔蒂约综合体的特许用水权,油井和含水层容量以及第三方提供补充水权的评估,试图增加设施的供水存在许多潜在问题。虽然目前的抽水井可能有能力提供增加的流量,但含水层本身可能是有限的,水质是潜在的问题。此外,CONAGUA限制从含水层中抽水,这可能会使增加现有特许权量的尝试复杂化。从第三方获得额外的水权也带来了潜在的法律和财务挑战。因此,确保足够的水供应以满足未来生产需求的首选方法是提高综合企业当前用水的效率。 WKB对建筑群中水耗最大的区域进行的审核产生了一系列潜在的节水和再利用机会。 Arcadis根据相对复杂性,成本和投资回报率,为项目实施提供了一种推荐的方法,据估计,该方法可以使综合大楼的用水量减少约30%。这种减少将为综合企业现有的水特许权提供足够的能力,以支持综合企业即将增加的产量,并消除了确定和确保额外供水的需要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号