首页> 外文会议>Annual Water Environment Federation technical exhibition and conference >Adaptive Planning - A Success Story from Coeur d'Alene, ID
【24h】

Adaptive Planning - A Success Story from Coeur d'Alene, ID

机译:适应性计划-来自ID Coeur d'Alene的成功案例

获取原文

摘要

Over a 15 year time frame the City of Coeur d'Alene worked incrementally towards compliance goals, which at the time were considered beyond the levels of technology. Early on the City approached this challenge through a combination of planning for the worst-case while educating regulators and stakeholders as well as conducting applied research to develop a more cost efficient compliance strategy. R&D was as much a means to an end and as it was a vehicle of engagement and a way to extend the compliance schedule through meaningful advances in effluent water quality. This strategy extended the compliance schedule and helped shape the final Spokane River dissolved oxygen total maximum daily load (TMDL) and reduced the compliance cost by approximately $30 million. Today the plant produces effluent quality well beyond that required for discharge to the Spokane River and the sewer rates are still only $35/household.
机译:在15年的时间框架内,科达伦市逐步实现了合规目标,当时这些合规目标被认为超出了技术水平。纽约市早期通过应对最坏情况的计划,同时教育监管者和利益相关者,以及进行应用研究以制定更具成本效益的合规性战略,从而应对了这一挑战。研发既是达到目的的手段,又是参与的工具,并且是通过有意义地提高废水水质来延长合规时间表的一种方式。该策略延长了合规时间表,并帮助制定了最终的斯波坎河溶解氧总最大日负荷量(TMDL),并将合规成本降低了约3,000万美元。如今,该工厂产生的废水质量远远超过了排放到斯波坎河所需的质量,下水道费用仍然仅为每户$ 35。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号