首页> 外文会议>Australasian Universities Power Engineering Conference >Connection of Solar PV to LV Networks: Considerations for Maximum Penetration Level
【24h】

Connection of Solar PV to LV Networks: Considerations for Maximum Penetration Level

机译:太阳能光伏到LV网络的连接:最大渗透水平的考虑因素

获取原文

摘要

Overcoming local limitations in distribution networks with high solar photovoltaic (PV) generation is a challenging issue, unless appropriate planning strategies and regulations are in place. Determination of solar PV hosting capacity of a distribution network can help in maintaining secure and healthy operation of the electricity grid without violating grid operational limits, specially during the peak solar power generation periods. This paper presents a feeder-based PV hosting capacity evaluation approach to determine a safe limit. It is proposed to use simplified calculations to establish the feeder hosting capacity in lieu of detailed network analyses, which increases complexity. Probabilistic nature of the proposed approach accounts for the randomness of solar PV presence within distribution networks. Monte Carlo Simulations (MCS) are performed to analyse maximum limits for solar PV integration using DIgSILENT PowerFactory as the simulation platform.
机译:除非适当的规划战略和法规,否则克服了高太阳能光伏(PV)生成的分销网络的局部限制是一个具有挑战性的问题。在不违反电网运行限制的情况下,可以帮助维持电网的安全和健康运行,在不违反电网运行限制的情况下,在不违反电网运行限制的情况下,可以帮助维持电网的安全和健康操作。本文介绍了一种基于馈线的PV托管能力评估方法,以确定安全限制。建议使用简化的计算来建立馈线托管能力,代替详细的网络分析,这增加了复杂性。所提出的方法的概率性质占太阳能光伏存在在分销网络中的随机性。 Monte Carlo模拟(MCS)进行了使用Digsilent PowerFactory作为模拟平台分析太阳能光伏集成的最大限制。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号