摘要

The quest for reliable and cost-effective solution of installing piles in deepwater led to the development of dynamically installed piles that embed themselves into the seabed through free-fall. Several variations of dynamically installed piles have been devised and successfully entered into service at deepwater offshore sites. The most notable one is the torpedo pile patented by Petrobras. To facilitate the design and installation of the dynamically installed piles, ABS has developed Guidance Notes to provide geotechnical design and structural assessment methods. This paper presents an overview of the guidance and details of the technical development that forms the basis of the recommended methods. In support of the development of the guidance, finite element analyses and centrifuge tests were conducted to study pile/soil interaction and to verify and further improve the prediction methods for pile pullout capacity. The pile inclination after installation, which has a significant effect on the pile pullout capacity and is of significant concern to the offshore industry, was thoroughly studied. Since the dynamic installation process results in lower short-term pullout capacity of the pile, it is recommended that the piles be installed for a sufficiently long period to allow the development of the pullout capacity. A prediction of the pile capacity restoration over time was developed based on the results of a series of centrifuge tests. A framework on the normalized vertical and horizontal component is proposed to predict the pile pullout capacities subjected to different loading angles.
机译:对在深水中安装桩的可靠且具有成本效益的解决方案的需求导致了动态安装桩的发展,这些桩通过自由落体嵌入海床中。已经设计出了几种动态安装桩的变体,并成功地在深水海上工地投入使用。最著名的是巴西国家石油公司(Petrobras)获得专利的鱼雷桩。为了便于动态安装桩的设计和安装,ABS制定了指导说明,以提供岩土设计和结构评估方法。本文概述了指导意见,并详细介绍了构成推荐方法基础的技术开发。为了支持该指南的制定,进行了有限元分析和离心试验,以研究桩/土相互作用,并验证和进一步改进了桩拉力的预测方法。彻底研究了安装后的桩倾角,它对桩的拔出能力有很大的影响,并且是海上工业的重要问题。由于动态安装过程会导致桩的短期拔出能力降低,因此建议将桩安装足够长的时间,以提高拔出能力。基于一系列离心测试的结果,对随时间推移的桩容量恢复进行了预测。提出了基于标准化的垂直和水平分量的框架,以预测在不同加载角度下的桩拔出力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号