首页> 外文会议>EPIA Conference on Artificial Intelligence >A Diversity Based Multi-objective Hyper-heuristic for the FJSP with Sequence-Dependent Set-Up Times, Auxiliary Resources and Machine Down Time
【24h】

A Diversity Based Multi-objective Hyper-heuristic for the FJSP with Sequence-Dependent Set-Up Times, Auxiliary Resources and Machine Down Time

机译:FJSP的基于多样性的多目标超启发式算法,具有序列相关的建立时间,辅助资源和机器停机时间

获取原文
获取外文期刊封面目录资料

摘要

In this paper a diversity based multi-objective hyper-heuristic (MOO-HMHH) algorithm for the flexible job shop scheduling problem (FJSP) with sequence-dependent set-up times (SDST), auxiliary resources and machine down time is analyzed. The algorithm is evaluated on real customer datasets to determine the impact of machine breakdown intervals and due dates on algorithm performance. The diversity based hyper-heuristic algorithm compared well to two other hyper-heuristic algorithms and to its constituent algorithms and promising results were obtained with respect to the increased generality of the hyper-heuristics.
机译:本文分析了基于多样性的多目标超启发式算法(MOO-HMHH),该算法具有与序列相关的建立时间(SDST),辅助资源和机器停机时间的柔性作业车间调度问题(FJSP)。该算法在真实的客户数据集上进行评估,以确定机器故障间隔和到期日对算法性能的影响。基于多样性的超启发式算法与其他两种超启发式算法及其组成算法相比,具有很好的可比性,并且就超启发式算法的普遍性而言获得了可喜的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号