首页> 外文会议>International Scientific Conference on Electric Power Engineering >Computer based Study about the Load Regime of a 40 MVA 110/6 kV Transformer
【24h】

Computer based Study about the Load Regime of a 40 MVA 110/6 kV Transformer

机译:基于计算机的40 MVA 110/6 kV变压器负载状态研究

获取原文

摘要

The power transformer is probably one of the most complex and most important equipment existing in the power transmission and distribution system. The evaluation of the technical condition, done with the double purpose of extending its life and reducing the risk of defect, is a complex and important activity, depending on the importance of the transformer in the system. Whether it's routine investigations or special investigations that appeal to the latest techniques and methods of measurement, in order to get a correct diagnosis, the measured data must be as accurately determined, correlated and evaluated on the basis of applicable technical regulations, the latest recommendations and information from the literature, and last but not least, the similar experience. This paper will show a case study for the variation of the load efficiency (the yield) as well as some economical aspects, based on real measurements and technical data.
机译:电力变压器可能是电力传输和分配系统中存在的最复杂,最重要的设备之一。根据延长变压器寿命和降低缺陷风险的双重目的,对技术条件进行评估是一项复杂而重要的工作,具体取决于变压器在系统中的重要性。无论是常规调查还是采用最新测量技术和方法的特殊调查,为了获得正确的诊断,必须根据适用的技术法规,最新建议和建议,对测量数据进行准确地确定,关联和评估。来自文献的信息,以及最后但并非最不重要的类似经历。本文将基于实际测量结果和技术数据,对负载效率(产量)的变化以及一些经济方面进行案例研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号