An Approach to Assess Engineering Change Effort Retrospectively Utilizing Past Engineering Change Information

机译:追溯利用过去工程变更信息的工程变更工作量评估方法

获取原文

摘要

The competitiveness of companies is nowadays highly dependent on an efficient product development. Shorter time to market, increased competition as well as accelerated market dynamics can be handled well by a continuous improvement in development efficiency. Hence, improving the development performance can have a big impact on the time to market. However, an increasing number of resources must be assigned to the management of engineering changes. The management of changes strongly influences the resources available for the actual design process. Furthermore, the increasing complexity of technical systems as well as the organization affects the engineering change situation and further induces change complexity. This paper therefore introduces an approach to retrospectively assess engineering change information to identify areas for reducing the change workload. It therefore introduces a procedure to guide users through the process of the assessment. In addition, it suggests indicators to evaluate the change situation regarding the induced workload. Finally, the approach is applied in a use case to investigate an engineering change data set.
机译:如今,公司的竞争力高度依赖于高效的产品开发。通过不断提高开发效率,可以很好地应对更短的上市时间,加剧的竞争以及加速的市场动态。因此,提高开发性能会对上市时间产生重大影响。但是,必须将越来越多的资源分配给工程变更管理。变更的管理在很大程度上影响了实际设计过程中可用的资源。此外,技术系统和组织的复杂性不断增加,影响了工程变更的情况,并进一步引发了变更的复杂性。因此,本文介绍了一种回顾性评估工程变更信息的方法,以确定可减少变更工作量的区域。因此,它引入了一个程序来指导用户完成评估过程。此外,它还建议了一些指标,以评估与诱发的工作量有关的变化情况。最后,将该方法应用于用例中以调查工程变更数据集。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号