首页> 外文会议>Triannual international conference on ports >Port of Hueneme Phasing Plan through Collaboration for a Wharf Deepening
【24h】

Port of Hueneme Phasing Plan through Collaboration for a Wharf Deepening

机译:通过合作进行码头深化的惠尼姆港口分阶段计划

获取原文

摘要

The Port of Hueneme, located in California between the Ports of Los Angeles and San Francisco, is undergoing a wharf strengthening and deepening project at Berths 1 and 2 for their 1970s era break bulk wharf. The objective of the project is to expand the port's ability to handle additional cargo with the same number of vessel calls, or fewer vessel calls, and to reduce the wait times of heavy-loaded Champion class tankers that must otherwise wait for high tides to enter the port. The wharf will be strengthened to restore the original capacity of the wharf and provide deepening from -35 ft (MLLW) to -40 ft (MLLW) through the installation of a steel sheet pile wall and dredging; and the mooring and fendering systems will be upgraded to accommodate the larger vessels. This paper will provide a project overview of the upgrade and deepening project and the phasing of such a project for construction and the challenges associated with keeping the tenants operational while construction is progressing.
机译:惠尼姆港位于加利福尼亚州洛杉矶港和旧金山之间,正在对1号和2号泊位的1970年代临时散装码头进行码头加固和深化工程。该项目的目标是扩大港口以相同数量的船舶呼叫或更少的船舶呼叫处理更多货物的能力,并减少重载的冠军级油轮的等待时间,否则,它们必须等待涨潮才能进入港口。码头将得到加强,以恢复码头的原始能力,并通过安装钢板桩墙和挖泥机,将码头的深度从-35英尺(MLLW)增加到-40英尺(MLLW);系泊系统和护舷系统将进行升级,以容纳更大的船只。本文将提供升级和深化项目的项目概述,以及此类项目的建设阶段以及在施工进行过程中保持住户正常运转所带来的挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号