Pier J, Berths 245-247, Landside Rail Girder Upgrade Project

机译:码头J,泊位245-247,陆上铁路大梁升级项目

获取原文

摘要

Vessels are getting larger in size and volume capacity to streamline the transport of goods. Current vessel sizes calling at the Port of Long Beach (POLB) have increased up to 18,000 TEUs (twenty-foot equivalent unit) and are continuing to increase in size. The aging wharf structure at Pier J, Berths 245-247, needed an upgrade to the structural capacity of the landside crane rail for the newer and taller ship-to-shore (STS) cranes to accommodate these larger vessels. The upgrade had to avoid disruption to the operator, who services approximately 2,000,000 TEUs per year. This paper presents the evaluations/analyses required and the design alternatives considered for the upgrade at Pier J. In addition, design/construction lessons learned and highlights of some of the innovative features that resulted in significant savings for construction costs and schedules are discussed.
机译:船只的尺寸和体积越来越大,以简化货物运输。目前在长滩港(POLB)停靠的船只尺寸已增加至18,000 TEU(二十英尺等效单位),并且尺寸仍在继续增加。 J泊位245-247码头的陈旧码头结构需要升级陆上起重机导轨的结构能力,以适应更高和更高的船对岸(STS)起重机,以容纳这些更大的船只。升级必须避免对运营商造成干扰,该运营商每年服务大约2,000,000 TEU。本文介绍了Pier J升级所需的评估/分析和设计方案。此外,还讨论了设计/施工的经验教训以及一些创新功能的重点,这些功能可显着节省建筑成本和进度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号