首页> 外文会议>IEEE Conference on Industrial Electronics and Applications >Photovoltaic consumption in distribution network considering shiftable load
【24h】

Photovoltaic consumption in distribution network considering shiftable load

机译:考虑可移动负载的配电网络中的光伏消耗

获取原文

摘要

The massive photovoltaic (PV) grid-connected leads to voltage violation in the distribution network. In this paper, a day-ahead schedule model is established to solve the problem of PV curtailment caused by overvoltage. Firstly, we theoretically analyze that the curtailment of PV can be reduced by adjusting the operating time slots of different types of shiftable load, the reactive power compensation of static var compensators and capacitors banks. Then, three different scenarios are set to study the PV consumption in the distribution network. Finally, simulations are carried out based on the modified IEEE 33-node distribution network. The simulation results verify the effectiveness and feasibility of the proposed model.
机译:大型光伏(PV)并网导致配电网络中出现电压违规情况。本文建立了提前调度模型,以解决过电压导致的光伏发电削减的问题。首先,我们从理论上分析,通过调节不同类型的可移动负载的工作时隙,静态无功补偿器和电容器组的无功补偿,可以减少PV的损耗。然后,设置三种不同的方案来研究配电网中的PV消耗。最后,基于修改后的IEEE 33节点配电网络进行了仿真。仿真结果验证了所提模型的有效性和可行性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号