首页> 外文会议>IEEE International Conference on Advanced Power System Automation and Protection >A Robust Reserve Scheduling Method Considering Wind Turbine Generator’s De-loading Control
【24h】

A Robust Reserve Scheduling Method Considering Wind Turbine Generator’s De-loading Control

机译:考虑风力发电机卸载控制的鲁棒储备调度方法

获取原文

摘要

The active power control makes wind turbine generators (WTG) have the ability to suppress the wind power fluctuations and relieve the system reserve burden. This paper proposes a robust reserve scheduling method that can consider the uncertainty of wind power and load with prediction error information given only, in which the WTG de-loading control is introduced and the robust constraints including the wind farm reserve and spinning reserve limits are formulated. Furthermore, the robust optimization model can be transformed into a certainty optimization counterpart based on duality theorem. The linear relaxation handling and the spatial branch-bound method are applied to achieve the global optimum. Finally, a modified IEEE 39-bus system with WTG integrated is used to validate the effectiveness of the proposed method.1
机译:主动功率控制使风力涡轮发电机(WTG)具有抑制风力波动并减轻系统备用负荷的能力。本文提出了一种鲁棒的储备调度方法,该方法仅考虑了预测误差信息,即可考虑风电和负荷的不确定性,引入了风力发电机组的卸荷控制,并制定了包括风电场储备和旋转储备极限的鲁棒约束条件。 。此外,基于对偶定理,可以将鲁棒优化模型转换为确定性优化副本。应用线性松弛处理和空间分支约束方法来实现全局最优。最后,使用改进的集成了WTG的IEEE 39总线系统来验证所提出方法的有效性。 1

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号