首页> 外文会议>International Conference on Power and Energy Systems >Planning Method of Feeder Automation of Distribution Network in Mountain Area Considering Distributed Generation
【24h】

Planning Method of Feeder Automation of Distribution Network in Mountain Area Considering Distributed Generation

机译:考虑分布式发电的山区配电网馈线自动化规划方法

获取原文

摘要

The existing planning method of feeder automation (FA) of distribution network in mountain area doesn't consider the access of distributed generation (DG), and has no differentiated guidance on the actual line situation. Aiming at the status quo, a new planning method of FA of 10 kV distribution network in mountain area considering DG is proposed in this paper, based on the analysis of the main construction mode of FA and the influence of the access of DG. Aiming at the minimum of total annual cost of automatic configuration, the planning model of FA is established. With the cluster results of actual line, the optimal solution of the model in different situations is obtained, including the types of configuration scheme and the numbers of switches. Further, the recommendation table of automation planning is formed, which is Instructive. The example shows the method is superior in economy satisfying the reliability index.
机译:山区配电网馈线自动化(FA)的现有规划方法没有考虑分布式发电(DG)的接入,也没有针对实际线路情况的差异化指导。针对这种情况,在分析FA的主要建设方式和接入DG的影响的基础上,提出了一种考虑DG的山区10 kV配电网FA的新规划方法。针对自动配置的年度总成本,建立了FA的计划模型。利用实际线路的聚类结果,获得了在不同情况下模型的最优解,包括配置方案的类型和交换机的数量。此外,形成了自动化计划的推荐表,该表具有指导性。算例表明,该方法在经济性方面满足可靠性指标是优越的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号