In recent years, face slab rupture has occurred on several high CFRDs, resulting in large leakage and even potential safety problems. In this paper, a case study on Buxi high CFRD (H=135.8 m) in China is conducted to illustrate mechanism analysis of the face slab rupture by using numerical analysis. It is found that large deformation and differential deformation of rockfill, cavity zones under the face slab, and structural defects of joints are the most important causes of the face slab rupture. Using the monitoring data, dam deformation and leakage were analyzed. This analysis predicts that leakage of the dam after rehabilitation will decrease by at least 80%. Rehabilitation measures are proposed and adopted for repairing the ruptured slabs and joints as well as the damaged waterstops. The leakage of the dam has decreased to less than 20% compared with the value for the same water level before rehabilitation, which is consistent with the pre-remediation prediction. Finally, conclusions are drawn, including suggestions for dealing with the face slab rupture issue of high CFRDs.
机译:近年来,在数个高CFRD上发生了面板破裂,从而导致大量泄漏甚至潜在的安全问题。本文以中国布溪高CFRD(H = 135.8 m)为例,通过数值分析说明了面板破裂的机理。结果表明,堆石的大变形和微分变形,面板下方的空洞区域以及节理的结构缺陷是面板破裂的最重要原因。利用监测数据,对大坝变形和渗漏进行了分析。该分析预测,修复后大坝的渗漏将减少至少80%。提出并采取了修复措施来修复破裂的平板和接缝以及损坏的止水带。与修复前相同水位的值相比,大坝的渗漏已减少到不到20%,这与修复前的预测是一致的。最后,得出了结论,包括对高CFRD的面板破裂问题的处理建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号