In the summer of 2014, in Salem, MA, construction started on a new $1.06 billion high efficiency, natural gas combined cycle power plant capable of generating enough electricity to power over 600,000 homes. Integral to project permitting and incorporating the new energy center into the Salem community, the perimeter of the plant is framed on three sides by an earthen berm supported on the inside by MSE wall with gabion facia, topped with a freestanding gabion wall. The design and construction of the berm faced multiple challenges: the design team had to contend with a project site composed of almost entirely landfill of various vintages and complying with permit design documents to capture the vision originally presented at project conception. The construction team faced the task of coordinating the design across multiple project stakeholders and constructing MSE/gabion wall simultaneously with the earthen berm and storm drainage within a tight corridor surrounding the active power plant project.
机译:2014年夏天,在马萨诸塞州塞勒姆市开始建设一座耗资10.6亿美元的高效天然气联合循环发电厂,该发电厂能够产生足够的电力,为60万户家庭供电。与项目许可集成在一起,并将新能源中心并入塞勒姆社区,该工厂的周边在三个侧面上由土制围墙框起来,土围在内部由MSE墙支撑,上面带有石笼网饰面,上面还铺有独立的石笼墙。护堤的设计和施工面临多个挑战:设计团队必须应对几乎完全由各种年份的垃圾填埋场组成的项目场地,并遵守许可证设计文件,以捕捉最初在项目构思时提出的愿景。施工团队面临的任务是在多个项目涉众之间协调设计,并在活动电厂项目周围狭窄的走廊内同时与土堤和暴雨排水一起建造MSE /石笼墙。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号