首页> 外文会议>International seminar of purple mountain forum academic forum >Decomposition Model Framework of Trading Volume of Cascade Hydropower Stations Under the Linking Mode of Medium-Long Term and Spot Market
【24h】

Decomposition Model Framework of Trading Volume of Cascade Hydropower Stations Under the Linking Mode of Medium-Long Term and Spot Market

机译:中长期与现货市场联动模式下的梯级水电站交易量分解模型框架

获取原文

摘要

The electricity market reform of China is in the transitional stage from medium and long-term market to spot market. At present, most provinces still focus on medium and long-term electricity trading. A few provinces, such as Guangdong, have begun to simulate spot market operation. At the present stage, how to link up the medium and long-term market with the spot market is a key technical problem to be solved urgently. Aiming at the decomposition and execution of medium and long-term transaction power of cascade hydropower stations, this paper proposes a model framework of transaction power decomposition under the mode of linking medium and long-term with spot market. In the first place, this paper presents two monthly trading power decomposition models according to different seasons. Then a daily generation planning method based on standard load curve is proposed to decompose the daily power. Finally, the proposed method is applied to a provincial power grid. The results show that the proposed method provides some ideas for the rational curve decomposition of transaction power.
机译:中国的电力市场改革正处于从中长期市场到现货市场的过渡阶段。目前,大多数省仍将重点放在中长期电力交易上。一些省份(例如广东省)已开始模拟现货市场的运作。在现阶段,如何将中长期市场与现货市场联系起来是亟待解决的关键技术问题。针对梯级水电站中长期交易功率的分解与执行,提出了中长期与现货市场联动模式下交易功率分解的模型框架。首先,本文提出了两个根据季节不同的月度交易能力分解模型。然后提出了一种基于标准负荷曲线的日发电计划方法,对日发电量进行分解。最后,将该方法应用于省级电网。结果表明,该方法为交易权的合理曲线分解提供了一些思路。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号