首页> 外文会议>IEEE Conference on Energy Internet and Energy System Integration >An Optimal Customization and Operation Strategy of Reserve-oriented Virtual Power Plant Based on CVaR
【24h】

An Optimal Customization and Operation Strategy of Reserve-oriented Virtual Power Plant Based on CVaR

机译:基于CVaR的后备虚拟电厂优化定制与运行策略。

获取原文
获取外文期刊封面目录资料

摘要

Virtual power plant (VPP) integrates demand response (DR) resources to provide reserve service for power system. VPP’s profit can be maximized by optimizing the internal DR portfolios. A day-ahead portfolio optimization-based customization strategy of reserve-oriented VPP is proposed in this paper according to the forecast data of power system’s reserve demand. Multi-scenario method is used to describe uncertainties associated with calling up reserve capacity and conditional value at risk (CVaR) is used to evaluate risk of VPP’s profit. DRs’ operating points are optimally adjusted to minimize the cost of being called up based on those scheduled day ahead. Results of case study show that qualified DR portfolios of VPP can be selected not only subject to DRs’ operating constraints, but also benefiting both VPP and DRs, which features excellent incentive compatibility.
机译:虚拟电厂(VPP)集成了需求响应(DR)资源,为电力系统提供备用服务。通过优化内部灾难恢复产品组合,可以最大限度地提高VPP的利润。根据电力系统的储备需求预测数据,提出了一种基于提前组合优化的储备型VPP定制策略。多情景方法用于描述与调拨储备容量相关的不确定性,而条件风险值(CVaR)用于评估VPP利润的风险。灾难恢复的工作点已进行了最佳调整,以最大程度地减少基于预定日的召集费用。案例研究结果表明,可以根据灾难恢复者的操作约束选择合格的灾难恢复者VPP投资组合,而且可以使VPP和灾难恢复者受益,后者具有出色的激励兼容性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号