首页> 外文会议>International Conference on Electrical Materials and Power Equipment >Onshore Simulation Test Setup for Temperature and Strain Sensing of Submarine Cable based on BOTDA
【24h】

Onshore Simulation Test Setup for Temperature and Strain Sensing of Submarine Cable based on BOTDA

机译:基于BOTDA的潜艇电缆温度和应变检测试验装置

获取原文
获取外文期刊封面目录资料

摘要

The 500kV submarine cable route of Hainan Networking System starts from Nanling Village, Jiaowei Township, Xuwen County, Zhanjiang City, Guangdong Province. It crosses the Qiongzhou Strait to Linshi Village, Qiaotou Town, Chengmai County, Hainan Province. Hainan Networking System 500kV AC Submarine Cable is the first ultra-high voltage, large capacity and long-distance cross-sea networking power cable in China. It is 31 km. In this article, there are three main parts. The first part introduces the status of submarine cable monitoring and the BOTDA test principle. The second part is to design a calibration experiment to calibrate the Brillouin temperature coefficient and the Brillouin strain coefficient for the test fiber of the submarine cable. The third part is to design the spatial distribution rate verification experiment of Brillouin optical time domain reflectometry analyzer to ensure the error of equipment and experiment, so that it can be applied in submarine cable in the future.
机译:海南网络系统500kV潜艇电缆路线从广东省湛江市徐文县济威镇南岭村庄开始。它穿过海南省成武县桥口镇临希村的琼州村。海南网络系统500KV AC潜水艇电缆是中国第一个超高电压,大容量和长距离海洋网络电力电缆。这是31公里。在本文中,有三个主要部分。第一部分介绍了潜艇电缆监测的状态和BOTDA测试原理。第二部分是设计校准实验,以校准布里渊温度系数和潜艇电缆的试验纤维的布里渊应变系数。第三部分是设计布里渊光学时域反射分析仪的空间分配速率验证实验,以确保设备和实验误差,使其在未来的潜艇电缆中可以应用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号