首页> 外文会议>UMN annual geotechnical engineering conference >U.S. Bank Stadium earth retention and other underground construction
【24h】

U.S. Bank Stadium earth retention and other underground construction

机译:美国银行体育场土方工程及其他地下建筑

获取原文

摘要

The earth retention systems for the U.S Bank Stadium, home of the Minnesota Vikings, were built during the winter of 2013-2014, the coldest in the Twin Cities in 35 years with an average temperature below 10°F. Schnabel Foundation Company designed and constructed permanent tieback soldier beam and wood lagging support systems up to 40 feet high to resist permanent lateral loads along the stadium below grade walls. Additionally, Schnabel installed temporary tieback soldier beam and wood lagging walls, rock anchor tiedowns for the stadium foundations, tiebacks for other temporary excavation support systems and drilled piers for a tower crane foundation between December 2013 and May 2014. The project's ground conditions created difficult challenges that required specialized equipment and tooling. The design and construction of the earth retention systems along with other site challenges and teamwork required to complete the work within the project's aggressive schedule are presented herein.
机译:明尼苏达维京人队所在地美国银行体育场的挡土板系统是在2013-2014年冬季建成的,这是双子城35年来最冷的一年,平均温度低于10°F。施纳贝尔基金会公司设计并建造了高达40英尺高的永久性回扣式士兵横梁和木质时滞支撑系统,以抵抗体育场在坡度墙以下的永久性横向载荷。此外,在2013年12月至2014年5月之间,施纳贝尔(Schnabel)安装了临时的后绑式士兵横梁和木板防护墙,体育场基础的岩石锚栓固定装置,其他临时挖掘支撑系统的后固定栓以及塔式起重机基础的钻孔墩。需要专门的设备和工具。本文介绍了土石保持系统的设计和施工,以及在项目积极的进度表内完成工作所需的其他现场挑战和团队合作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号