首页> 外文会议>Asian conference on remote sensing;ACRS >ANALYSIS OF FLOODPLAIN ENCROACHMENT USING HEC-RAS 2D UNSTEADY FLOOD FLOW MODELING
【24h】

ANALYSIS OF FLOODPLAIN ENCROACHMENT USING HEC-RAS 2D UNSTEADY FLOOD FLOW MODELING

机译:基于HEC-RAS 2D非稳态洪水模型的洪水泛滥分析

获取原文

摘要

The study attempts to provide a methodology for a rapid assessment of flood dynamics over an area using HEC-RAS 5.0.5. HEC-RAS has been improved and includes new abilities of performing 2D flood routing over a large area at variable time steps. Its computational engine also has been parallelized in a 64-bit environment resulting to reduced run times even for large watershed areas. It would be sufficient to provide an initial assessment of flow extent and depth using generalized workflow especially for areas where there are no available extensive data on rainfall, land use and soil types. The study was performed on a 210-km" watershed with LiDAR-derived DEM covering almost 70% of the area including its floodplain. The LiDAR DEM was resampled to 5-m resolution and fused with a 5-m resolution IFSAR DEM for the remaining area of the watershed. The whole watershed was considered as 2D flow area at 30m x 30 m flow grid with a breakline on the highway centerline. HEC-HMS is used to estimate excess precipitation over the area. Several simulations are performed at established rainfall probabilities of 4%. 2% and 1%. Results are compared from flood simulations performed on terrains before and after the presence of major built infrastructures on the floodplain. Results show that full 2D unsteady flood modeling over a whole watershed could be used to have a rapid assessment of flood dynamics over an area.
机译:该研究试图提供一种使用HEC-RAS 5.0.5快速评估整个地区洪水动态的方法。 HEC-RAS已得到改进,并包括以可变的时间步长在较大区域上执行2D洪水路由的新功能。它的计算引擎还已经在64位环境中进行了并行化,从而即使在大集水区也能减少运行时间。使用广义的工作流程提供流量范围和深度的初步评估就足够了,尤其是对于没有可用的有关降雨,土地利用和土壤类型的广泛数据的地区。这项研究是在210公里长的分水岭上进行的,该分水岭由LiDAR衍生的DEM覆盖了包括洪泛区在内的几乎70%的区域。LiDARDEM被重新采样至5 m分辨率,并与5 m分辨率的IFSAR DEM融合。整个流域被认为是30m x 30 m流网格上的二维流域,在高速公路中心线上有一条折线,HEC-HMS用于估算该区域的过量降水,在确定的降雨概率下进行了一些模拟分别为4%,2%和1%。在洪泛平原上存在主要建成的基础设施之前和之后,对地形进行洪水模拟的结果进行了比较,结果表明,整个流域上的完整2D非稳态洪水建模可用于获得快速评估某个地区的洪水动态。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号