首页> 外文会议>IABSE symposium on tomorrow's megastructures >Difficulties on Earthquake Design due to Standards Limits on an Extensive Offshore Bridge, Sheikh Jaber Al-Ahmad Al-Sabah Causeway in Kuwait
【24h】

Difficulties on Earthquake Design due to Standards Limits on an Extensive Offshore Bridge, Sheikh Jaber Al-Ahmad Al-Sabah Causeway in Kuwait

机译:科威特酋长国谢赫·贾伯·艾哈迈德·萨巴赫铜锣湾大桥由于标准限制而在地震设计上遇到困难

获取原文

摘要

Subiyah project design was implemented with long discussions due to standards limits. With 36 km of viaducts, all decisions had a significant impact on quantities and then on cost. Project is based on 2.5 and 3.0 m monopiles and standards design requirements are not adapted for such diameters. Moreover, some additional project requirements, not addressed in most of the codes, made also the design more complex (service earthquake and imposed strength reduction factor). All those parameters led to complex discussions on earthquake design: R factor value, capacity design, seismic detailing, P-D effect, asynchroneous motion, seismic design of bearings. The aim of this article is then to present all the previous inconsistencies of project standards for non-typical structures, all related discussions, and the numerous comparisons that have been done with Eurocode to explain and/or solve the problems.
机译:由于标准限制,Subiyah项目设计的实施经过了长时间的讨论。拥有36公里的高架桥,所有决定都会对数量产生重大影响,然后对成本产生重大影响。该项目基于2.5和3.0 m单桩,并且标准设计要求不适用于此类直径。此外,大多数规范中未解决的一些其他项目要求也使设计更加复杂(服务地震和施加的强度折减系数)。所有这些参数导致了关于地震设计的复杂讨论:R因子值,承载力设计,地震细节,P-D效应,异步运动,轴承的地震设计。然后,本文的目的是介绍以前所有非典型结构的项目标准不一致之处,所有相关讨论以及与Eurocode进行的众多比较,以解释和/或解决问题。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号