首页> 外文会议>International conference on ground control in mining >Highwall Stability Implications from Longwall Mining at Broadmeadow Mine
【24h】

Highwall Stability Implications from Longwall Mining at Broadmeadow Mine

机译:Broadmeadow矿长壁开采的高壁稳定性意义

获取原文

摘要

The Broadmeadow punch longwall coal mine in Central Queensland Australia has experienced significant highwall movement associated with the effect of longwall subsidence when the longwalls approach their final position close to the open-cut highwall. In response to this movement, Broadmeadow employed two types of broadscale highwall monitoring (radar and laser scanners) to provide full coverage measurement throughout three consecutive longwalls approaching the highwall. This was to attain a better understanding of the mechanism causing the movement and potentially enable prediction of instability. Results from the monitoring found the highwall is displaced to magnitudes unlike those typically measured in open-cut mining and in direct contrast with typical longwall subsidence behaviour. This paper discusses the ground movements measured, monitoring methods used, safety measures established, as well as theorising the failure mechanism. Recommendations are made for mine and pit designs for future punch longwall layouts. The paper shows how the movements measured are more aligned to some measurements made during stream valley closure studies previously presented at the ICGCM and challenge the mechanisms suggested by previous literature.
机译:在澳大利亚昆士兰州中部的Broadmeadow冲床长壁煤矿,当长壁接近最终位置时,长壁沉陷会导致长壁沉陷。为了响应这一运动,Broadmeadow采用了两种类型的大型高墙监控系统(雷达和激光扫描仪),以在接近高墙的三个连续长壁中提供全覆盖测量。这是为了更好地理解引起运动的机制,并有可能预测不稳定性。监测的结果发现,与露天开采中通常测量的高壁厚相比,高壁的位移量大,并且与典型的长壁沉陷行为形成直接对比。本文讨论了测得的地面运动,所使用的监测方法,已建立的安全措施以及理论上的破坏机理。针对矿山和矿山的设计提出了建议,以备将来的冲头长壁布置使用。本文显示了所测量的运动如何与先前在ICGCM上提出的流域闭合研究期间进行的某些测量更加一致,并挑战了先前文献所建议的机制。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号