首页> 外文会议>UKSim-AMSS International Conference on Computer Modelling and Simulation >Automated Volume Analysis of Open Pit Mining Productions Based on Time Series Aerial Survey
【24h】

Automated Volume Analysis of Open Pit Mining Productions Based on Time Series Aerial Survey

机译:基于时间序列航测的露天矿产量自动分析

获取原文

摘要

Photogrammetry based 3D model creation provides a new opportunty to survey and to evaluate natural and arificial surface formations. The photos needed for 3D model building can be taken using fixed wing aircraft or multicopters. These machines are more economical and are capable of more precise route tracking than big machines operated by human personnel. Depending on the size of the area (0.5 to 10km2), the survey can be finished within an hour. The volume calculation method is introduced in the paper through the example of an actual, operating mine. Previous, mainly manual but competent analytical tasks, which demand engineering work, can be partly replaced agorithmically. The method may provide more accurate volume results than a conventional geodetic survey, as it builds a model with 10 cm resolution of any examined area or object. Another advantage is that the results are ready within a few hours after beginning the survey, it is not necessary to wait days for accurate volume data.
机译:基于摄影测量的3D模型创建为调查和评估自然和人造表面形成提供了新的机会。 3D模型构建所需的照片可以使用固定翼飞机或多旋翼飞机拍摄。与人工操作的大型机器相比,这些机器更经济并且能够进行更精确的路线跟踪。取决于区域的大小(0.5至10km 2 ),调查可以在一个小时内完成。本文以一个实际运行的矿井为例介绍了体积计算方法。以前的,主要是手工的但能胜任的分析任务(需要工程工作)可以被部分取代。与传统的大地测量相比,该方法可以提供更准确的体积结果,因为它可以建立任何被检查区域或物体分辨率为10 cm的模型。另一个优点是,在开始调查后的几个小时内即可准备好结果,无需等待数天即可获得准确的体积数据。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号